BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Natick Report - ECPv6.18.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Natick Report
X-ORIGINAL-URL:https://www.natickreport.com
X-WR-CALDESC:Events for Natick Report
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20270314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20271107T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20260326T183000
DTEND;TZID=America/New_York:20260326T203000
DTSTAMP:20260320T013054Z
CREATED:20260320T013054Z
LAST-MODIFIED:20260320T013054Z
UID:34540-1774549800-1774557000@www.natickreport.com
SUMMARY:MassDOT in-person public meeting for status update on Routes 27/9 project
DESCRIPTION:THE COMMONWEALTH OF MASSACHUSETTS \nMASSACHUSETTS DEPARTMENT OF TRANSPORTATION – HIGHWAY DIVISION \nNOTICE OF AN IN-PERSON PUBLIC INFORMATION MEETING \nProject File No. 605313 \nAn In-Person Public Information Meeting will be hosted at Wilson Middle School\, at 22 Rutledge Road\, Natick\, MA\, 01760\, to present a status update for the Route 27 and Route 9 Bridge Replacement and Interchange Improvements in Natick. \nWHEN: Thursday\, March 26\, 2026\, 6:30 p.m. – 8:30 p.m. \nWHERE: Wilson Middle School\, 22 Rutledge Road\, Natick\, MA\, 01760 \nPURPOSE: The purpose of this meeting is to update the public on the status of the bridge replacement project and interchange improvements. MassDOT will present the project background\, the schedule and construction phasing\, the right-of-way process\, project landscaping\, public involvement\, and next steps. The meeting will include a presentation by the project team followed by a question-and-answer session. All views and comments will be reviewed and considered to the maximum extent possible. \nPROJECT: This project will include the replacement of the structurally deficient Bridge No. N-03-020 which carries North Main Street (Route 27) over Worcester Street (Route 9) and consists of the reconfiguration of the interchange to a modified Diverging Diamond Interchange (DDI) configuration. The reconfiguration will provide safety improvements\, reduced traffic congestion through the interchange\, and improved bicycle and pedestrian facilities using separated shared use paths and sidewalks. The project length is approximately 3\,850 feet along Route 9 and 2\,120 feet along Route 27. The work will also include transit stops along Route 27 and Route 9 along with reconstructed sidewalks\, drainage improvements\, traffic signals\, retaining walls\, utility relocations\, signing\, roadway lighting\, and landscaping. \nThis meeting is accessible to people with disabilities. MassDOT provides reasonable accommodations and/or language assistance free of charge upon request (e.g.\, interpreters in American Sign Language and languages other than English\, live captioning\, videos\, assistive listening devices and alternate material formats)\, as available. For accommodation or language assistance\, please contact MassDOT’s Chief Diversity and Civil Rights Officer by phone (857-368-8580)\, TTD/TTY at (857) 266-0603\, fax (857) 368-0602 or by email (MassDOT.CivilRights@dot.state.ma.us). Requests should be made as soon as possible prior to the meeting\, and for more difficult to arrange services including sign-language\, CART\, language translation\, or interpretation\, requests should be made at least ten business days before the meeting. \nThis meeting will be posted\, or a cancellation announcement posted\, on the internet at:\nhttps://www.mass.gov/orgs/highway-division/events \nJONATHAN GULLIVER CARRIE LAVALLEE\, P.E.\nHIGHWAY ADMINISTRATOR CHIEF ENGINEER
URL:https://www.natickreport.com/event/massdot-in-person-public-meeting-for-status-update-on-routes-27-9-project/
CATEGORIES:Transportation
END:VEVENT
END:VCALENDAR